Back
Magmatic Resources Ltd ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Magmatic Resources Ltd
ASSET TYPE
Development
Development METALS & MINERALS
Coal(steel making), Copper, Gold, Iron ore
SPECIFIC LOCATION
Kenya
CURRENT ASSET STATUS
  • Seeking Partnership
THE ONLY
The only exploation consultancy firm in the lower Eastern part of Kenya
REFERENCE OR DISTRICT NAME
Kitui
CURRENT ASSET STATUS NOTES

Magmatic is a consultancy company seeking to partner with Exploration and Mining companies to bridge the gap between Exploration and development. 

It addresses the available options and technologies for development of different minerals.

The main objective is to increase the competitive advantage of any Mining company.

OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
Optioner Magmatic 100
0
0
ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Coal 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Iron ore 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Coal 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Copper 0 k mt 0 % 0 m lbs 0 % 0 k mt 0 % 0 m lbs 0 % 0
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Iron ore 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0 k mt 0 % 0
DRILLING STATUS
NEW RESOURCE ESTIMATES ANTICIPATED ON
Feb 24, 2018
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Coal (k mt) Produced752
00000000Copper (m lbs) Produced762
00000000Gold (k oz) Produced792
00000000Iron ore (k mt) Produced812
00000000Coal (k mt) Sold751
00000000Copper (m lbs) Sold761
00000000Gold (k oz) Sold791
00000000Iron ore (k mt) Sold811
00000000Coal Recovery (%)754
00000000Copper Recovery (%)764
00000000Gold Recovery (%)794
00000000Iron ore Recovery (%)814
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRCoal (mt)Copper (lbs)Gold (oz)Iron ore (mt)
Date of Assessment
Jun 5, 2026